Sunday, August 1, 2010

Fwd: THREE LAUNCH PADS TO THE FUTURE





-----Original Message-----
From: rrdd3939@aol.com
To: rrdd3939@aol.com
Sent: Sun, Aug 1, 2010 3:28 am
Subject: Fwd: THREE LAUNCH PADS TO THE FUTURE







EDITOR'S NOTE: OUR SLOGAN IS: "FAIR and BALANCED."                                                
A POST FROM THE HONORABLE OPPOSITON FOLLOWS WHICH IN TURN IS                             FOLLOWED BY THREE MORE SPECIFIC POSTS FROM OUR SIDE.
Sent: Sat, Jul 24, 2010 3:24 am
Subject: Fwd: THREE LAUNCH PADS TO THE FUTURE

1) SENATE Sub-Committee on Justice-Commerce-Science (that's logical!)
2) HOUSE   Committee on Science-Technology                                                                                                                                                          3) CITIZEN REPORTER groups.google.com/group/rickcosmos-eclectic                                                                                                                                        
                                                                                                                                                                                                                 1)A: 3 more Space Shuttle Flights                                                                                                                                       B: Orion Continues                                                                                                                                         C:  Ares 1 cancelled                                                                                                                                       D:   Development begins on a new Heavy-Lifter somewhat based on Ares 5                                                    begins next, completed 2016                                                                                                                                                E: Taxpayer money spent on private/commercial sector development of                                                          earth-to-orbit-to-earth capability - $6 billion over 8 years                                                                                     F:  Moon Base Cancelled                                                                                                                                 G:  Money spent on NASA developing new technologies reduced                                                                                             2)A: 2 more Space Shuttle flights                                                                                                                     B:  Orion continues                                                                                                                                        C: Ares 1 may or may not be cancelled                                                                                                            D: Development of Heavy-Lifter largely-based on Ares 5 begins next year,                                                      completed by 2016                                                                                                                                         E: Taxpayer money for private sector - $4.5 over 8 years                                                                                       F: Moon Base cancelled                                                                                                                                 G: Money spent on developing new technologies less then Senate                                                                                Sub-Committee                                                                                                                                                                                       3) A: Space Shuttle program extended for 2 to 4 years                                                                                  B: Orion continues                                                                                                                                     C:  Ares 1 continues                                                                                                                                  D:  Ares 5/Saturn S-N Combo More money spent developing new                                                    technologies, including, nuclear thermal propulsion and nuclear-generator                                                       E:  Aid to private sector - less then $2 over 3 years for NASA consultation                                                    and use of NASA facilities                                                                                                                           F:  Moon Base cancelled; 4 missions to Moon in 2020 and 2021 Lunar 'arctic' and                                   'antarctic'  regions and 3 to 5 additional missions if justified by the 4 missions                                             Plans subject to change as they go through congressional process. We must continue our plan to                save NASA  with monthly phone call and/or message left at website of the 9 key members of               Congress; info available at www.rickaddsite.blogspot.com, rickscisite.blogspot.com,                              YouTube: Rickaddsite. Each of the 3 shuttles are certified for over 75 more missions. It's a                      disgrace for U.S. to be dependent on Russia (whom we beat in Moon Race and have made it               abundantly clear that they are going to charge us an arm and a leg; what if they don't comply with our          scheduling  and scientific 'window' requirements) and/or China (our banker!) to take us to and from our        Space Station - international my foot, we paid bulk of the cost! - for 4 to 6 years while we're                   grounded; important science to be done at Lunar poles; Ares 1 can get Orion or modified X-37B                     can get us to Space Station in 2 to 4 years; spend more to built on existing technology and create                new technologies for economy's sake. Obama wants the two top priorities of the National
Aeronautics and Space Administration to be: 1) Making Muslims feel good about themselves:
their historic contributions in science, math., engineering (International Psychotherapy and
2) Green 'Hockey Stick' pseudo-science. Obama learned science from scientific illiterate Al Gore!  

No comments: